In-stock orders placed before 3 pm Central Time ship same day! Click here for details →

Mittler Bros. 1/8 inch Wire Bead Roll Set

Part #: 201-125-WBS
Ships From: Factory shipped
Lead Time: Usually ships within 1 week
We want to give you the best information possible regarding your order at Trick-Tools and product availability is very important to us. This information reflects our best estimate of the shipping time for your order on a product-by-product basis. Items in stock at our warehouse typically ship same day if the order is placed before 3pm Central Time.

Availability on Items shipped directly from the factory is an estimate for that product based on averages from our experience. Items marked 'Call for Availability' have limited stock or unpredictable lead times and require a phone call to get a lead time estimate. We apologize but we are unable to guarantee lead times on factory-shipped items.
Price: $240.00

SHIPPING:
UPS
ORIGIN:
BRAND:
Mittler Bros logo
Quantity:

DESCRIPTION

These roll sets allow you to crimp a 1/8 inch diameter wire onto the edge of a panel. This stiffens the panel and is good for fender wells or any place where a stress crack needs to be avoided. All bead rolls are made from heat treated tool steel for a lifetime of quality service.

SPECIFICATIONS

Size (inches): 1/8 inch
Shape: wire bead set
Type: steel
Dimensions (LxWxH): 2.75 OD - .75 inch bore

INCLUDES

  • Wire bead roll set, step 1
  • Wire bead roll set, step 2
  • Wire bead roll set, step 3

DOCUMENTATION

4.7 stars
5 Star Excellence award from Shopper Approved for collecting at least 100 5 star reviews
www.trick-tools.com has a Shopper Approved rating of 4.7/5 based on 20,329 ratings and reviews